

I commissioned the boat to be built in 2020. The steel hull was delivered in December 2020 and work began. Almost all of the interior was made with second hand wood: pallets, oak flooring from a school near Cardiff, oak parquet from a house in Watford and pine from a barn.



I did the electrics myself. She was fully solar-powered and ran off a 48v Lynch motor.



We lived on her until 2025.







